Mosman Preparatory School
Mosman Preparatory School This project was a four-level build. It required a complete strip out of an existing building at the school and incorporating into a new four level building, increasing the level floor space from 200m² to 650m². The build included 8 new classrooms, a library, [...]
Charles Sturt University, Port Macquarie, Stage 2
Charles Sturt University, Port Macquarie, Stage 2 Vision Lighting has now supplied lighting to a second stage of the Charles Sturt University permanent campus at Port Macquarie.
Rutherford Public School
Rutherford Public School Works at Rutherford Public School consisted of a new homebase building, administration centre, hall and canteen. Vision Lighting provided a comprehensive lighting package, including downlights, panels and low bays; assisted with lighting design and EFSG compliance; and managed all deliveries according to the construction [...]
Rosehill Public School Learning Centre
Rosehill Public School Learning Centre Works for the Rosehill Public School Learning Centre comprised the demolition of the existing COLA structure and associated hard landscape surfaces, to allow construction of a new three storey building. The building incorporates an outdoor learning area, basketball court, practical activity areas, [...]
Carlingford Public School Learning Centre
Carlingford Public School Learning Centre The Carlingford Public School Learning Centre project involved the demolition of the existing tennis court and carpark structures to accommodate the new building. Features include 20 homebases, a multi-purpose hall, library, amphitheatre and COLA area surrounded by coloured concrete tiered seating. The [...]
Alexandria Park Community School
Alexandria Park Community School The redevelopment of Alexandria Park Community School involved the demolition of the existing school and construction of a new school suitable for 1,000 primary and 1,200 secondary students. The new construction included: Multiple school buildings up to 5 storeys, including classroom home bases, [...]
University of Newcastle Bioresources Facility
UON Bioresources Facility The University of Newcastle's new Bio-Resources Laboratory is located on their Callaghan campus. It consists of a 2-storey, 3,500 square metre holding and procedure facility. The Laboratory areas throughout were required to be built to a PC2 specification (Physical Containment [...]
Wenona Girls School
Wenona Girls School Wenona School of North Sydney was established in 1886, and in late 2016, works began on a large-scale revamp and expansion of this prestigious girls college. The project involved the construction of a new six storey building containing an aquatic [...]
North Rocks Public School
North Rocks Public School North Rocks Public School of Sydney NSW, an excellent facility catering for the needs of all students, saw an upgrade beginning in early 2019, to create 15 new flexible learning spaces, as well as new amenities and administration facilities. [...]