Mosman Preparatory School
This project was a four-level build. It required a complete strip out of an existing building at the school and incorporating into a new four level building, increasing the level floor space from 200m² to 650m². The build included 8 new classrooms, a library, open learning areas for both staff and students, storage areas and a lift. The entire space has reverse cycle air-conditioning. A new fully equipped canteen and associated covered education space within the under croft was also established.